March 2006 Archives

How to install bamboo flooring

| 2 Comments





Bamboo Articles

Bamboo Basics
Is Bamboo For You?
Westhollow Bamboo Installation

Westhollow Bamboo Installation

Westhollow_Bamboo_Installation1

In this installation, the plywood floor offers a simple surface to apply bamboo over. Rolling out kraft paper is the first step. The paper acts as a moisture transition between the new floor and the existing floor as opposed to a moisture barrier used on concrete. Kraft paper also known as roofing felt is widely available.

Westhollow_Bamboo_Installation2

The paper should be trimmed at the walls using a utility knife.

Westhollow_Bamboo_Installation3

Starting the first row of bamoo is easy to do by making sure you have adequate distance between the wall and the floor (1/4" - 1/2"). This gap can later be covered by baseboard. The process for the first row is to top nail the boards to insure adequate strength in holding the boards.

Westhollow_Bamboo_Installation4

To maintain the gap, spacers are often used to make it easier to work with the floor without compromising the required expansion/contraction area. Often times spacers can be doubled up to provide a consistent wider gap. The cut board that was from the end of the first row will be used to start the second row.

Westhollow_Bamboo_Installation5

Once you are into the second row you can start using an angle nailer. Be sure that you stagger the end joints of the boards so that the floor has more of a random appearance. This is done by cutting rows 2 & 3 by one third to start the rows. Then the cut ends can be used to start rows 4 and above. The technique is especially important for fixed lengths floors.

Westhollow_Bamboo_Installation6

A pneumatic tool can now provide angled nails (aka staples/cleats) on the tongue of the new row. Row 1 was top nailed and row 2 is angle nailed. Sometimes the term angle nailing is also called secret nailing or hidden nailing, but it all refers to the same basic principle. The nail is driven into the top of the tongue at an angle which drives farther into the new flooring and into the subfloor. The next row's tongue then fits over the groove and therefore hides the nail. It is important to make sure that the nail is seated flush in the tongue to avoid causing difficulity when sliding the next row in place. Additionally be careful not to over power your pneumatic settings which can lead to blowing off the tongue all together. Finally making sure the proper size tool for the flooring is the final tip to get started right.


Westhollow_Bamboo_Installation7

When you are nearing the end of the row
you can use a full plank of the flooring and
then mark your cut based on the remaining
amount required between the last board
and the wall. (don't forget to maintain the
expansion and contraction gap!) Also be
careful with this process to avoid scratching
or denting your new flooring even by
accident.


Westhollow_Bamboo_Installation8

This process can be repeated quickly and
easily once the first few rows are
completed. The pace of the installation
really picks up.


Westhollow_Bamboo_Installation9

Often times top nailing is required at edges
or walls to insure a very secure installation
of the perimeter boards. The top nail holes
can be filled with putty.


Westhollow_Bamboo_Installation10

When you reach the end of a wall a cut
(aka rip) is what is needed. You will want to
make sure that the piece maintains the
expansion gap between the ripped board
and wall. Measure twice and cut once!


Westhollow_Bamboo_Installation11

This photo shows a perfectly seated nail in
the tongue. It is flush, yet not driven too far
into the flooring, which would reduce the
holding power of the nail. This is picture
perfect.

Westhollow_Bamboo_Installation12

To install bamboo on stair risers you can
use 2 normal sized boards for standard
heigths. Sometimes a board need to be cut
or "ripped" down to make it fit. The rips are
most commonly placed at the top of the
riser which are then concealed by the stair
nosing.


Westhollow_Bamboo_Installation13

The stairnose is applied first and then the
other two boards are applied. Depending on
the depth of the stair a cut may be required
at the back of the stair. A smaller gap can
be left on stairs. The gap and cut edge will
be hidden by the riser.


Westhollow_Bamboo_Installation14

This photo shows a flush stair nosing that
can be used on stair ways. This piece would
be applied at the front edge of the stairs
and would overlap the riser. The remainder
of the stair is filled in using normal planks.
There are also pre-made FULL treads and
risers available in some westhollow
products. This is the premium option and
looks and feels the best.


Westhollow_Bamboo_Installation15

To apply the stair nosing using a high
quality glue or construction adhesive is
essential.


Westhollow_Bamboo_Installation16

Without applying too much glue it is
important to balance good coverage without
overkill on adhesive. This photo shows an
ideal pattern. The same concept would
apply the the full stair treads.


Westhollow_Bamboo_Installation17

The stair nosing and filler pieces are
typically both glued and top nailed. Filling in
the top nail holes and making sure the nails
are properly recessed into the flooring is
important.

Westhollow_Bamboo_Installation18

For this top step we need to using a little
ingenuity to accomplish a nice looking
transition while maintaining an expansion
gap. Here a T-molding is combined with a
stair nosing to create the perfect solution.


Westhollow_Bamboo_Installation19

A jamb saw or even a regular hand saw can
help undercut your door jambs to allow the
floor to slide underneath. This is an area
where baseboard is not proper to apply, yet
you must maintain an
expansion/contraction area. By
undercutting the jamb you can hide the gap
under the door jamb.


Westhollow_Bamboo_Installation20

Marking cuts around this area follows the
same guidelines as the cuts in the room.


Westhollow_Bamboo_Installation21

The stair nose is applied on this step down
the same way as it was on the stairs. (glue
and top nailing.)


Westhollow_Bamboo_Installation22

When you reach that last row you can use a
board to determine where to mark your cut.
(don't forget the expansion gap.)


Westhollow_Bamboo_Installation23

This is another shot of that last row that has
been ripped down and needs to be top
nailed. Sometimes it is a good idea to apply
some adhesive under this board as well.

Westhollow_Bamboo_Installation24

The satisfaction of a job well done comes
quickly when the beauty of your new
flooring investment is completed! After a
quick clean up for dust the floor is ready to
be lived on. Proper maintaince is critical to
keeping the flooring healthy over the long
run. This includes rugs in walk off areas,
especially interior and exterior doors.
Notice the natural shade variation supplied
by mother nature. As with all flooring
variation in color should be expected.
Additionally keeping felt protectors under
chairs, tables etc...(like shown under the
pool table.)


Westhollow_Bamboo_Installation25

Perfection!
Perfection!

About this Archive

This page is an archive of entries from March 2006 listed from newest to oldest.

May 2004 is the previous archive.

February 2007 is the next archive.

Find recent content on the main index or look in the archives to find all content.